Loading...

Call Us Now
864.224.5800
Mon - Thur: 8:00am - 5:00pm
Fri: 8:00am - 12:00pm

Palmetto Grill

Project info

  • Status: Completed
  • Location: Anderson, South Carolina

This 5,153 square foot facility totals over $1.2 million in construction costs. The single-level structure is made of steel and concrete block with metal stud infill. The exterior is brick and fiber cement veneer; the flat roof features gable accents.